Sunday, March 06, 2011

From the no lie they won't tell category: Light Rail, One Year Later: A Train of Broken Promises

.
Those paying attention in this neck of the woods already know the more Goebbelian aspects of the typical CRC bridger/looter. From politicians like the mayor of Vancouver using an anti-toll lie to get elected, all the way to Steve Stuart attempting to use his position to stall the vote that he was SO proud of when he announced it (Even though, according to Pridemore's gerrymander bill, a vote is required... so he was trying to take credit for something he couldn't... then... have avoided.) so the legislature can take our right to vote away and blow the democratian's mythical "user fee" nonsense out of the water.

Well, here's our future: Sound Transit used the same types of lies concerning costs, lengths, ridership and everything that goes with it. The Washington Policy Center gets us the low-down.


Opinion/Editorial

Light Rail, One Year Later: A Train of Broken Promises

As our first year with light rail comes to a close, Sound Transit officials are certain to declare the experiment an unqualified success. Yet, a closer look at the actual performance shows citizens are not getting what they are paying for.

In 1996, Sound Transit officials promised voters they would build 25 miles of light rail for a total cost of about $1.8 billion, and they would be finished by 2006. In fact, officials were so confident in their “conservative” projections they called it, “Sound Move, The 10-Year Regional Transit System Plan.”

Fourteen years later, Sound Transit officials have reduced the planned line to 21 miles, and have only delivered about 17 miles for about $2.6 billion. The rest will not be finished until around 2020 for a total cost approaching $15 billion. In other words, Phase 1 is smaller, billions over budget and more than a dozen years late compared to what officials originally promised voters.

Here are some other promises from 1996 that Sound Transit officials have failed to deliver (quotes are from the Sound Move plan adopted in May 1996 and passed by voters in November 1996):

Promise: “[Sound Transit] is committed to building and operating a ten-year system plan that can be confidently funded and completed as promised to the region's citizens.”
Reality: Today, the initial segment is already four miles shorter, billions over budget and more than a dozen years late from what was promised in 1996.

Promise: “If voters decide not to extend the system, [Sound Transit] will roll back the tax rate”
Reality: Voters rejected an extension in 2007, but Sound Transit officials did not roll back taxes. Instead, officials pushed for a second measure the following year, which voters ultimately approved.

Promise: Light rail will carry 32.6 million riders per year, or 107,000 per weekday, by 2010.
Reality: Today, light rail carries 17,000 to 20,000 riders per weekday and will likely carry only 5.6 million riders for the year.

Promise: “Sound Move is based on extremely conservative cost and ridership
assumptions.”
Reality: Despite claiming seventeen times that Sound Move’s cost and ridership projections are based on “conservative” estimates, Sound Transit officials are spending billions more and carrying fewer riders than what they told voters.

Promise: Riders will pay more than half (53 percent) of the annual operating costs of light rail.
Reality: Today, Sound Transit officials say riders will cover only 40 percent, but actually are on track to recover far less than that.

Promise: “The light-rail system will provide significantly greater reliability than all other types of public transportation in the region.”
Reality: Today, the Central Link light rail segment has an on-time performance of only 71 percent, while other modes average above 90 percent.

Promise: Sound Transit’s initial light rail facility can carry 22,000 passengers per hour, per direction. Reality: Today, the facility carries about 425 passengers per hour, per direction.

The region’s light rail system is not living up to its expectations because Sound Transit officials deliberately overestimated benefits and underestimated costs to make the project appear attractive to voters. Once the agency won higher taxing authority, its promises fell apart.

Even the Puget Sound Regional Council (PSRC) says passenger rail will carry about half of the riders from what Sound Transit told voters.

Even if Sound Transit’s ridership projections somehow come true, light rail will still only carry about one percent of all daily trips. Worse, Sound Transit says two thirds of these riders will come from the existing bus system.

For example, Sound Transit forced King County Metro to eliminate Route #194, one of the county’s most popular bus routes. Sound Transit officials hope these displaced bus riders will be forced to shift to light rail.

The average cost for King County to operate a Metro bus is about $4 per passenger trip. The average cost for Sound Transit to operate light rail is $7.62 per passenger trip. So we are building a redundant system for billions in capital expenses that costs nearly twice as much to operate.

City and county officials recently closed the aging South Park Bridge, saying they don’t have the $130 million needed to replace it. The bridge serves as many daily travelers as the entire $3 billion light rail system. Many regional transportation projects go unfunded while Sound Transit officials spend billions on a train few people will ever ride.

Our first year with light rail has proven to be a massive waste of taxpayer’s money.

Past as prologue. This is our future, Clark County.

Government officials behind this horrific effort use the Sound Transit template of lies and deceit, because our state supreme court has ruled that it's perfectly OK for the government to lie to us when they're trying to get what they want.

Politicians like Steve Stuart, who have long since put the special interests of his democrat and union buddies ahead of his constituents, PROMISED us a vote. During his campaign, he BRAGGED about GETTING us a vote, EVEN THOUGH A VOTE WAS REQUIRED... hopping to tap into the same pool that Tim "The Liar" Leavitt used to get elected. Stuart had no problem being all that concerned about the will of the people when he could use it as a campaign prop.

Now, when defeat is inevitable?

Stuart wants to stall. He wants the legislature to do his dirty work so he can Bart Simpson this vote, and blame everyone else.

The problem is that I don't exactly see him leading the charge to keep the legislature out of this and make this a local issue.

Regardless of this outcome, Steve Stuart's failure to keep his word will be the major element in the result.

And by the way, Steve? If the economy was running like a Swiss watch, we'd still overwhelmingly oppose your tax scam... because the issue isn't about taxes... it's about the lie that is the CRC.

1 comment:

  1. There could be two reasons for all the Light Rail lying:
    (1) There is truly graft and corruption going on with payoffs and deceit, (which I hope is not true), or;
    (2) Some kind of ideology is taking precedence that is political is nature but would lose in a political environment (voting), so it is operating in this under-handed and dishonest fashion.

    The 2nd option seems the most plausible, and I have supporting evidence - there is a “Build Up Not Out” urban planning contingent that is pushing Light Rail at the expense of everything else. I wondered if the BUNOs were Democrats, but the Washington State Dem Platform has these 3 “Transportation” planks:
    • Significant public input and oversight into major transportation public works.
    • Polices and public funding that make travel as safe and efficient as possible…
    • Investments in public infrastructure that broaden individuals’ multimodal transportation choices.

    No BUNO there – so I don’t know where it’s coming from? Portland?

    ReplyDelete

If I cannot identify you, then your post will be deleted.

No threats (Death or otherwise) allowed towards me or anyone else. If you have allegations of misconduct, they must be verifiable before I will publish them in comments.

Enjoy!